New Additions to the Fleet

Brand new Putzmeister Telebelt.

Masterlink is excited to announce the newest additions to our fleet! In the last year we have introduced 2 brand-new Putzmeister 38-meter pumps and a brand new Putzmeister Telebelt 110. With these additions, Masterlink

More

Placing Boom at work

Have you ever witnessed a placing boom at work? Building a high-rise structure from the ground up isn’t a walk in the park, but a climb. Floor by floor, Masterlink operators utilize the truck-free

More

Into the River

Our 5-section 38 meter recently pumped this piling into the Chicago River. It was an interesting project with many obstacles, not all of which were physical. As always, Masterlink found a way to get

More

Collegiate Project in Indianapolis

Here are a few pictures from the Collegiate project by our friends at Midwest Construction in Indianapolis, Indiana. Indianapolis is an ever-growing city, and our ever-growing company is excited to be a part of

More