Placing Boom at work

Have you ever witnessed a placing boom at work? Building a high-rise structure from the ground up isn’t a walk in the park, but a climb. Floor by floor, Masterlink operators utilize the truck-free boom to place concrete as the building is erected, while one of our pump trucks at ground-level pushes the concrete up to the work zone.

 

Masterlink handles projects of all size, and as this project shows, the sky is the limit.

 

indiana construction masterlink concrete pumping placing boom masterlink pumping concrete placement boom placing boom indianapolis concrete pumping